TECHNICAL SESSION 1
Technical Session 1(A)
Disaster Prevention & Mitigation Chairperson: Radianta Triatmadja and Koji Iwamoto Cashmere, Level 1 |
||
1015 – 1030 |
Erica Elice Uy
Characterization of Cebu Province Municipalities using Probabilistic Seismic Hazard Assessment (PSHA) and Geographic Information System (GIS)
|
751 |
1030 – 1045 | Duc-Duy Ho Structural Health Monitoring for Sustainable and Resilient Infrastructure Management using Smart Technologies |
752 |
1045 – 1100 | Stephen John Clemente Risk Assessment of Seismic Vulnerability of All Hospitals in Manila using Rapid Visual Screening (RVS) |
787 |
1100 – 1115 | Trika Pitana Passenger Evacuation Analysis of Ro-ro Ship for Disaster Mitigation Policy |
796 |
1115 – 1130 | Amir Al Hamdi Redzuan A Method of Identifying Critical Road Segment: A Case Study of Peninsular Malaysia Road Network |
802 |
1130 – 1145 | Raihan Maskuriy Manmade Disaster Prevention using Industry 4.0 Technology for Construction Waste Management Aspect |
820 |
1145 – 1200 | Adam Pamudji Rahardjo Evaluation on Hydraulic Performance of a Flexible Barrier for Debris Flow Flood |
824 |
1200 – 1215 | Kok Wah Choo A Comparative Analysis of Seismic Resistant Building Between Kuala Lumpur and Pulau Pinang, Malaysia |
829 |
1215 – 1230 | Nabila Huda Aizon Seismic Performance of Long Cable-Stayed Bridge With Various Time History Loading Using Finite Element Method |
849 |
*The oral presentation is 12 minutes + 3 minutes question and answer session.
Technical Session 1(B)
Disaster Risk Management and Disaster Risk Reduction Chairperson: Maria Cecilia Paringit and Pinnara Ket Zenith 3, Level 1 |
||
1015 – 1030 |
Linh Mai Thi Yen
Coastal Vulnerability Assessment in Da Nang City, Vietnam
|
773 |
1030 – 1045 | Mohd Muhaimin Ridwan Wong Flood Preparedness Among Agencies in Segamat, Johor |
779 |
1045 – 1100 | Bunmanut Heng Flow Regime Alteration Analysis under Climate Change in Sreng River Basin, Tonle Sap Lake |
780 |
1100 – 1115 | Muhammad Fisham Abu Basah Flood Hazard Risk Matrix For Flood Plain Control In Merlimau River Basin Melaka |
785 |
1115 – 1130 | Pinnara Ket Impacts of Drought on Rice Irrigation Water Needs based on Statistical Downscaling of Future Scenarios in The Chrey Bak Catchment, Cambodia |
803 |
1130 – 1145 | Amira Abdullah Al-Tholaya Factors Influencing Monitoring and Evaluation Implementation of Water Sanitation and Hygiene Response (WASH) Programs in Yemen |
805 |
1145 – 1200 | Michael Almeida A Multi-spatial Assessment Framework to Geological Hazard for High-Rise Building Project in Metro Manila, Philippines |
810 |
1200 – 1215 | Nooradilla Abu Hasan Analytical Method on Reliability of Rainfall Data from X-Band Polarimetric Radar |
826 |
1215 – 1230 |
Norazah Arjuna Seismic Fragility Curve of Steel Structure Industrial Building Using IDA Method |
850 |
*The oral presentation is 12 minutes + 3 minutes question and answer session.
Technical Session 1(C)
Flood Management Chairperson: Andres Winston Oreta and Phu Le Vo Zenith 4, Level 1 |
||
1015 – 1030 |
Azlan Saleh
Flood Inundation Mapping using Sentinel-1 SAR Imagery. Case study of the November 2017 Flood in Penang
|
768 |
1030 – 1045 | Mohd Shahrulnizam Mat Rani Flood Mitigation Measures in Urban Areas of Malaysia using Integrated Catchment Modelling Approach |
769 |
1045 – 1100 | Noor Diyana Fazan Ahmad Community Flood Preparedness to Flood Disaster in Johor, Malaysia |
784 |
1100 – 1115 | Xin Hui Chan Designing Early Warning Flood Detection and Monitoring System via IoT |
801 |
1115 – 1130 | Ummu Hani Mahamad Anuar Application of Rainfall-Runoff Inundation (RRI) Model – Case Study at Langat River Basin |
804 |
1130 – 1145 | Siti Hafsah Zulkarnain Structural, Locational and Environmental Attributes Effects the Residential Property Value in Flood Risk Area |
815 |
1145 – 1200 | Muhammad Hassim 1D Flood Model of Urban Drainage System using XP-Storm Water Management Model (XP-SWMM) Software |
837 |
1200 – 1215 | Nurhazimah Nazmi Parameter Estimation of Extreme Rainfall Distribution in Johor Using Bayesian Markov Chain Monte Carlo |
843 |
1215 – 1230 | TBA TBA |
TBA |
*The oral presentation is 12 minutes + 3 minutes question and answer session.